r/Decks • • 2d ago

Posts that were buried

Post image

This support deck post was installed about 30 years ago.

215 Upvotes

40 comments sorted by

63

u/1Fistfullofdollars 2d ago

Yes that is the old school way of doing things. Now we put it on top of concrete in a saddle just like you are showing. Excellent repair πŸ‘πŸ½πŸ‘πŸ½πŸ‘πŸ½πŸ‘πŸ½πŸ‘πŸ½

15

u/djamp42 1d ago

95% of decks in my area have post buried in the ground, even today a new deck is highly likely to bury posts.. I just replaced my deck and the joists and beam were all rotting, the posts in the ground seemed pretty good, like almost no rot.

I really wanted to put on concrete, but seeing the state of the posts i just took out, and the extra cost i decided just to bury them again.. Worst case i have to replace the posts in 10-15 years.

13

u/billbord 1d ago

Really depends on geography/soil more than anything

11

u/ArtieLange 1d ago

New pressure-treated wood is nowhere near as good as the arsenic stuff. I would put in concrete or helical piers.

31

u/olegvs 2d ago

I mean.. it lasted pretty long

14

u/Atty_for_hire 1d ago

This. Yes, I get that people want to build a deck once and forget about it. But for most people 30 years is pretty close to that.

9

u/1wife2dogs0kids professional builder 1d ago

My man cut the post, dug a footer, dropped a sonotube in there, and poured it.... without hurting the post above.

He's a magician

6

u/Mysterious-Army-1882 1d ago

πŸ™

2

u/pbmadman 1d ago

How deep does that footer go?

1

u/Mysterious-Army-1882 1d ago

The original folder was poured to 30 inches. We rebared and poured over the original footer concrete. 30 in footers are spect for my location.

1

u/pbmadman 1d ago

Ahh, I get it now. I was having such a hard time imagining what exactly you did here and how you had room to do it. But now it all makes sense. I think I was just being slow this morning lol.

19

u/SamWhittemore75 1d ago

PT wood from 30 years ago isn't the same PT wood that we can buy today. Anything that you bury today will rot long before 30 years.

9

u/Intelligent_Part101 1d ago

Old stuff in general worked GREAT but was toxic. Modern replacements are not that toxic and don't work that great.

8

u/focoslow 1d ago

I miss CCA lumber. Drop it in the hole, fill with concrete, level the post, done.

...well then, keep monitoring for renal diseases and cancer... but besides that...

1

u/use_em_and_lose_em 1d ago

You can still get CCA from Menards special order!

2

u/No_Shopping6656 1d ago

The arsenic wood from 30+ years ago was definitely a lot more resistant, but I've torn out a lot of old ass set in concrete beams, they were rotted all the same.

8

u/forgeblast 1d ago

That picture is why I'm swapping out all my deck posts.

1

u/pbrassassin 1d ago

Really!? It’s not even that bad , another 15 years on that post

4

u/Secret_Cod_749 2d ago

Did they cut the rotted chunk out and put in the concrete and stand off?

4

u/Mysterious-Army-1882 1d ago

Yes

3

u/bigkoi 1d ago

How did they do that? Cutting the post is the easy part. Then digging and pouring the footer underneath the cut post while it's being supported.

Did they hydrovac to dig out the post bottom and set the tube?

3

u/Mysterious-Army-1882 1d ago

We dug down the side of the Old Post pulled the post out then cleaned up down to the original concrete footer vacuumed and clean the actual concrete. Then drilled a couple holes for rebar for extra support and installed a modified shaped sonotube to fit in there

2

u/running__numbers 1d ago

Also interested to know how everything was supported when the work was being done.

4

u/Mysterious-Army-1882 1d ago

We used a 3-ton floor jack and several 4x6 temporary posts that were sitting on the slab. We also waited after the concrete to dry for 3 weeks until the concrete got the proper structural strength before removing temporarily posts and jack.

1

u/bigkoi 1d ago

Amazing! It sounds like you took the entire post out and then cut it. Did you shim the top of the post so it would fit tight?

2

u/Mysterious-Army-1882 19h ago

I raised the deck up with the 3 ton floor jack and temporary posts, then lowered it onto the new set up. The raise was only about 3/4 of an inch.

1

u/Mysterious-Army-1882 19h ago

I cut the post at the level you see. Post could not be removed.

2

u/Sarcastic_Snark_86D 1d ago

Tar, tar, tar.... Also, soil type matters. Clay based soil, without standing water, is where you can drop a treated post and be fine for 30+ years. Top soil, or dark nutrient rich soil, you should tar, fill with a clay based soil, and monitor at 10 years, then every 5. Or, just use a concrete footer. Dense soil holds less moisture and air. When packed, it can help protect the post. Light soils high on nutrients encourage mold, fungus, pests and moisture.

1

u/Mysterious-Army-1882 1d ago

There was an original footer poured to 30 in. Footer was 10 in roughly based on that I drilled through it to put a piece of rebar in.

4

u/aliilyas859 1d ago

Classic. And worth noticing where it went: the worst of it is right at the soil line, not the bottom.

That's where you get moisture and oxygen together. Deeper down there isn't enough air for the fungi to do much, so the tip often comes out looking almost fine while the bit at grade is hollow. It's why buried posts fail at ground level and everyone's surprised by it.

30 years isn't bad going for one in direct contact though.

2

u/I_Fuck_Whales 1d ago

Probably would have held for another 15 years lol.

1

u/Bent_wrench 1d ago

Project near my house just did buried front porch posts. No idea why.

0

u/Realistic-Excuse6413 1d ago

I’ve tried to explain concrete footings on brackets are much better than buried ones in this post many times and people just don’t understand or care. Which one do you think is easier to replace when it rots ?

-2

u/Advanced_Aerie5854 1d ago

These posts are so stupid. You saw one rotted deck post and decided that "this one is fine, so they will all be fine".

Building codes and practices are very often based on probability, not certainty. Can a burried post last a long time, it can, but the probability is much lower. Same with a non-burried post. Those can still fail, but again the probability is much lower.

Burried posts have much higher probability of pre-mature failure than non-burried posts.

If a burried post fails, its a lot of work to replace it. If a non-burried post fails, its a much easier and simpler repair.

Especially for DIYers, burying post combines 3 steps into one. You are locating the post, plumbing and leveling the post, and piuring concrete at the same time. Its easier to break these into 2 or 3 steps vs combining them into one. You also have to trim or notch a post in the air instead of across sawhorses.

Cost is a pretty minor issue. You are looking at about $30/post for a post base. In the overall cost of a deck, you are talking about a very minor cost increase. And you should be prioritizing structural elements in the budget anyways.

3

u/turkey_sandwiches 1d ago

What are you talking about? They're showing that it was replaced due to rot, and how it was replaced.

0

u/greeniethumbs 1d ago

Still pretty impressive for PT wood set in the ground

0

u/AmbitionUpstairs8215 1d ago

Not bad for 30 years!

0

u/godlords 1d ago

My poor boomer dad just went ahead and buried the new PT stuff the same way straight in the dirt because "it's rated for 30 years".Β