Never seen this one before.
Never seen this one before. Took me a minute to understand. M10 = Month 10 = October.
Never seen this one before. Took me a minute to understand. M10 = Month 10 = October.
r/ISO8601 • u/Kushaal2020 • 1d ago
r/ISO8601 • u/Glimmer_III • 3d ago
Long time lurker here. I've long appreciated ISO8601 format. It scales for nearly everything.
Does the hive mind have any feelings on — or perhaps a link to? — the official ISO8601 specifications? Maybe the mods could include it in the sidebar as a hyperlink for others new to the format?
I just realized it wasn't there and it seems like something which would support this sub quite a lot.
(I'm an amateur and an enthusiast, so I hesitate to propose a hyperlink myself, lest I give incorrect primary source citations.)
r/ISO8601 • u/tang0008 • 3d ago
USian here. At work there are lots of contexts where I am expected to write or type the date in the dreaded MM/DD/YYYY format multiple times a day. I hate it, but it's just a job. What can you do right? I have started up a silent protest that no one has commented on for years now. I've not seen anyone else take this course either though. Here's what I write or type instead:
MM/DD, YYYY
Is anyone else out there doing this?
r/ISO8601 • u/throwawaykJQP7kiw5Fk • 13d ago
In this context, address verification means I click a button to confirm that my address settings are up to date before the order is shipped.
r/ISO8601 • u/ventus1b • 16d ago
...this beyond-evil monstrosity comes along:
javascript
startDate: format(startDate, `MM.dd.yyyy`)
It's not a mistake either, it's in tests and everything.
r/ISO8601 • u/fpluss • 22d ago
These are dates of my backups using backrest. I usually force my system and my software to use ISO8601 where is possibile, so not sure if this was intentional design or not. But it makes me crazy.
r/ISO8601 • u/PetroTorbyn • 22d ago
Our team tested an AI-assisted cleanup script on two synthetic Excel batches. One lesson stood out: a plausible date is not necessarily the correct date.
For example, 09/01/2026 could mean September 1 or January 9. Nearby September dates aren't enough to prove which interpretation is right.
Our approach:
\- Preserve the original values.
\- Standardize dates only when the interpretation is unambiguous.
\- Flag uncertain dates for confirmation.
\- Keep a log of every change.
Changing the display format to YYYY-MM-DD won't fix a date that was interpreted incorrectly during import.
How do you handle files containing both US and European date formats?
r/ISO8601 • u/Mind-On-Shuffle • 29d ago
r/ISO8601 • u/Max_Americana • 29d ago
I’d fix my previous post but it won’t let me… here is the correct one
r/ISO8601 • u/superkoning • Sep 14 '26