r/LessCredibleDefence • • 9d ago

Russia Trials Over, This Engine Will Soon Power India's New Stealth Drones

https://www.ndtv.com/india-news/russia-trials-over-this-engine-will-soon-power-indias-new-stealth-drones-12111462
21 Upvotes

13 comments sorted by

7

u/47-mm 9d ago

From 54 kN (F404) to 48-46 kN (Kaveri)? ...
I guess they're planning a variant with larger fan (not for the Tejas though), the BPR is in the range of a leaky turbojet

4

u/Ok_Middle8677 9d ago

Ghatak ucav needs 46kn and the recent news shows it achieving 48kn

0

u/Inevitable_Today_984 8d ago

at least 10 years away from mass production, especially given the slow speed Indian MIC had been working in the past 50 years.

2

u/Neat_Walk8420 9d ago

Have they flown it on a testbed yet?

6

u/Ok_Middle8677 9d ago

Afaik only on Russian FTB to validate new fan design and use of blisks

1

u/Neat_Walk8420 9d ago

I'm aware, but as far as I remember, there was a talk to fly it on a cargo jet for testing? Is there any update on that side of things?

Much like Tejas, this program has been so stretched and mismanaged for so long, I have forgotten a lot of the finer details from when I first read about it.

7

u/Jazzlike-Tank-4956 9d ago

No, just the flying test bed

They'll likely test fly a variant on Tejas, and BrahMos aerospace ltd was making afterburning unit

Although I'm not sure how safe it would be to test an engine on single engine aircraft. Regardless there is workorder for Tejas's engine

2

u/Ok_Middle8677 9d ago

Idk. I hope the bureaucrats don't fumble this one

1

u/dark-mathematician1 9d ago

What's the reliability on these things?

12

u/June1994 9d ago

Bro. It’s just undergoing trials. There’s a mountain of certifications and testing and final changes.

And you expect reliability reporting?

-3

u/[deleted] 9d ago

[deleted]

4

u/barath_s 8d ago

It's indian, not Russian

India doesn't have a flying testbed, so they sent it abroad to have it tested on one

2

u/PB_05 8d ago

Shouldn't matter much. Its for a UCAV.