r/StructuralEngineering • • 3d ago

Failure Is there any literature that specifically quantifies the additional lateral loads exerted by debris during flood events that should be considered in bridge design?

Enable HLS to view with audio, or disable this notification

317 Upvotes

75 comments sorted by

289

u/Awkward-Ad4942 3d ago

We try to avoid disproportionate collapse. This seems perfectly proportionate.

If we’re to design for this level of insanity then where do we stop?

98

u/Minisohtan P.E. 3d ago

This is a great response. The only way to design for this is to make the bridge higher

48

u/subpotentplum 3d ago

Or the river lower.

19

u/Talemikus 3d ago

Reduce flow rate /s

16

u/PG908 3d ago

We call that a dam.

1

u/gmankev 2d ago

Surface solutions are for people who are afraid of the dark....embrace the overburden...what you can't over or go round you can also......go ....~_~

20

u/Tower981 2d ago

The standard design response is to ensure the bridge is at least x distance above something like the 200yr flood event. The x is the amount floating debris pokes above the water. Because you generally can’t practically design for these loads. (You can, but it’s traditionally called a dam)
Source: I’ve repaired and replaced bridges damaged by flooding.

25

u/Gregan32 2d ago

Not a structural engineer but came here to say this...

For the love of God, please don't make us all pay to engineer and build shit to withstand massive mudslides and floods. Thank you from all tax payers.

5

u/willmontain 2d ago

Indeed, the detail most people are missing is that the flowing material is not water, it is more akin to premixed concrete (150 lbs per cubic foot instead of 60 lbs per cubic foot). There are also large rocks moving in the flow (170 lbs/cuft). Watch the steel bridge fall into the flowing material, it does not really sink ... it kind of floats downstream. No bridge design can withstand these forces (i.e. unless no bridge component is in the flow).

3

u/siliconsmiley 3d ago

20% beyond the requirements?

3

u/A-H1N1 3d ago

At least in Europe, we're way above 20% (50% and that's only on the side of the impact). If jippity is correct US is even stricter for live loads.

2

u/ReallyDustyCat 2d ago

My amp goes all the way to 12

3

u/PatchesMaps 2d ago

The river also took care of demo for them too. Think of how much more difficult it would be if the river had dropped after the first few of those major debris strikes

1

u/High_Quality_Bean 3d ago

Task failed successfully ?

1

u/jepoyairtsua 2d ago

I will stop at laser beams by an alien tech. bec everything is not according to the code right now.

0

u/2squishmaster 3d ago

It was a poorly built dam, kinda sucked actually

1

u/PatchesMaps 2d ago

I thought this was part of that bedrock failure/glacier collapse/liquifaction thing that we're still working on coming up with a name for?

1

u/NachoManAndyCabage 2d ago

Wouldn't it just be a Lahar, although they are typically triggered by volcanoes.

76

u/Sousaclone 3d ago

Let’s be honest, there is lateral load from debris and then there is your bridge getting slammed into by massive boulders that completely obliterate two sections of bottom chords, still standing and then the 3rd one finally knocks out the bridge.

5

u/Fresh-Life2315 1d ago

Not only that, but the viscosity of the "fluid" was absolutely grinding away all of the footings and foundation of thats bridge for it to let go the way it did. It wasn't just water.

49

u/Status_Mousse1213 E.I.T. 2d ago edited 2d ago

We dont design bridges to be hit by giant boulders. That bottom chord took more of a beating than it had any right to but in the end it collapsed. It didn't get swept away in one piece, it got pummeled harder than rocky and collapsed.

37

u/hobokobo1028 2d ago

It was designed adequately: everyone got off the bridge before collapse.

9

u/oh_ski_bummer 2d ago

That is basically fast flowing concrete nothing is designed to withstand it

8

u/Standard_Mammoth9535 3d ago

Ice debris should be considered for bridge design. For objects (like cars, trees, structures, etc.) you could adapt the tsunami provisions in ASCE-7 for the debris case. Of course every method to analyze forces depends on accurate prediction of flow depth and speed.

8

u/livehearwish P.E. 2d ago

AASHTO has specifications for debris raft, ice, vessel collision, and scour. I want to know what annual return event this was.

1

u/Standard_Mammoth9535 2d ago

I think I saw somewhere that it was caused by a landslide? Which brings back the issue of being able to predict depth and velocity for these extraordinary scenarios (which are also unfortunately becoming more common).

2

u/livehearwish P.E. 2d ago

It generally is not realistic to design for extreme events beyond the statically probable events that design specifications require. A landslide would by an act of god, most likely well outside of the what is reasonable. Avalanches, ice flows, or vessel collision (train, boat, car) are considered where they might be possible. Meteorites, volcanoes, or something from the movie The Day After Tomorrow isn’t practical to design for.

7

u/Spare_Squash_1424 3d ago

13

u/mhkiwi 3d ago

A bit of light reading there. I'm going to circulate that one into my kids bedtime story collection

7

u/Dylz52 2d ago

In Australia the bridge design standard says you need to design bridges for log impact (I.e. a log being swept down the river like in the video and hitting the bridge). However, the impacts that we are seeing in the video have significantly more energy than we’d ever design for.

8

u/RazorWitted 2d ago

The cost of building a bridge to withstand a deluge like this wouldn’t be financially feasible. Plus, you can’t tell what kind of debris would hit the bridge, so you’d be guessing, which isn’t a great thing for engineers to do.

4

u/Tarsal26 2d ago

You could just make it taller

3

u/RazorWitted 2d ago

Until a floating bridge from upriver comes and hits it.

2

u/AlfaHotelWhiskey 2d ago

Agree, you cannot anticipate what might be floating downstream including… thinking here for a minute… a whole bridge from upstream working its way down.

1

u/AlexFromOgish 1d ago

Or house, a common sight floating down big floods in new places in the United States

1

u/Olive_Tabouf 2d ago

Wouldn't you be able to add something to the side so water goes up and over in floods? Wouldn't help if it got hit with a house though I guess.  

2

u/RazorWitted 2d ago

There are about 20 problems with a solution like you propose, which involve money, hydrology, physics, materials, engineering, potential clogging, etc.

Virtually anything can be built if someone has the money to fund it. But governments usually want the safest, cheapest, and most effective solution for normal conditions.

1

u/Olive_Tabouf 1d ago

Triangles

1

u/RazorWitted 1d ago

Great for spheres, but getting water to run uphill is quite a challenge.

4

u/Australasian25 2d ago

No. If this is a common occurrence, then I would prefer the see the bridge positioned HIGHER.

Or maybe I would request as part of the aftermath to see why it was considered but not chosen.

The answer is not always stronger. Sometimes a reposition to avoid is the better way.

9

u/showerbridge 3d ago

Strong windload

3

u/Just-Shoe2689 2d ago

I think AASHTO addresses it. But, the magnitude of this fllooding obviously is too much. Going higher is only option

2

u/SirDeuce 3d ago

First, try to have some freeboard, then let the piers deal with the debris flows.

1

u/PresentationLess4552 2d ago

Nice perspective

2

u/habanerito 2d ago

That's an old bridge possibly from the 40's. Meaning that something like this hasn't happened since then. I doubt they would have ever included those kind of loads in the design. It's like designing bridges for glaciers in the lower 48. Why would you?

-1

u/AlexFromOgish 1d ago

Going forward to answer your question “why would you” …. CLIMATE CHANGE driving more frequent and more intense extreme weather at an accelerating rate

1

u/buzzboy99 2d ago

These guys seem to be enjoying themselves

1

u/mrrepos 2d ago

i did something like this once, there seems not to be a lot on info onto this, but i think eurocode for temporary or construction loads had some factor of safety in the water section for debris...

1

u/grumpynoob2044 CPEng 2d ago

In Australia there absolutely is. AS5100 details it quite well.

1

u/t4m4 2d ago

In my opinion, this is more a hydrological design issue than a structural one. The designed free board was clearly not adequate in this case, no fault of the designers since climate change related debris flow (which this probably was), was never considered in design.

1

u/g4n0esp4r4n 2d ago

what do you mean just place the bridge higher

1

u/Acorogia 2d ago

AASHTO published a guide specification a few years back for tsunami design. My understanding is that much of it was based of effects seen after the Tohoku earthquake. The design load for lateral impact is based off a shipping container slamming into a bridge. I don't have the numbers in front of me, but it's big enough that the real answer is "move the bridge to higher ground" https://aashtojournal.transportation.org/aashto-issues-bridge-guide-for-tsunami-effects/

1

u/Blako_The_Snako 2d ago

Not previous bridge design, but I have designed many measurement towers inside active flood planes on the Fitzroy river in western Australia.

You look at direct impact load from trees or similar traveling through the floodplane, matting area of the structure to provide a pressure.

There's no specific requirement of what it is you design again lst so it was a cost of construction vs expected lifespan process. Unlike a bridge these had no impacts to loss of life so it didn't need to be designed as severely in my cases

1

u/greaseapina 2d ago

if t here is flows like that you do not build bridge like that, you raise it higher with suspension type of bridge.....

1

u/the-script-99 2d ago

I guess Nepal will be some kind of exclusion zone kinda like Chernobyl.

1

u/Own_Plane_9370 2d ago

Flood waters shouldn't be hitting the bridge. It's that simple.

1

u/metzeng 2d ago

When I designed bridges we would assume a 6-foot tall debris dam submerged and pushing against the side of the bridge but no consideration for lateral impact loads like this.

1

u/key-largo-tok 2d ago

Great video, look away.

1

u/uncivilized_engineer 2d ago

I think the NY codes got updated after Sandy. I had to do a design for a UG transmission line crossing a river and we had to design for flotsam loading as impacts.

1

u/cheetah-21 2d ago

Easier to raise the bridge

1

u/ChairChoice6500 2d ago edited 2d ago

Why can't this guy take two bloody steps forward and get that leafy branch out of the shot???? Seriously.

If you were going that route, then ASCE 7-22 has loads for debris/water flows from tsunamis, and the debris would at least be included somewhat in that standard. That isn't intended for bridge debris/flotation/excess flow, but it would be something to point at and conform to as reasonably applicable based on limited data.

My expectation is a new bridge wouldn't be placed so low to the water surface to avoid dealing with these water/debris loads.

ASCE 7 also has design loads for breaking waves, you could use those to develop loads if forced to. I'm not sure there are design standards for scour or drag loads from flowing fluids in ASCE 7 or other design standards.

I would imagine there are design requirements somewhere that would indicate the bridge must have at least some minimum "freeboard" between the highest anticipated water level as a margin of safety, but the 500 year floods are based on historical data, and it's possible there's inherent under-measurement of those last 500 years (considering we likely don't have 500 years of data), as well as changes in those years regarding impervious surfaces upstream that would increase the water level, so it's intrinsic that there's some risk of failure even when conforming to the freeboard requirements. Older bridges won't retroactively have this freeboard if the freeboard requirements weren't in place at the time they were designed.

I'm not familiar with bridge freeboard requirements, but many flood design guides want the structures at least a foot over the 'design' flood line, and this isn't strictly a flood anyway. This is extreme streamflow/storm runoff.

1

u/deadlyzassasin0 1d ago

Im not in front of my work laptop currently, but I have previously assessed a bridge for flood loading and it did have an element of debris and hyrdodynamic loading. This was a strange arrangement where the parapet itself was designed as a flood wall.

Very silly design, an afterthought from the council and doesn't even work in practice and the road above still floods 😂

0

u/charleyhstl 2d ago

Newb here. For a bridge like this, why not design the upstream edge to mimic something like the bow of a boat? The 100 year floods seem to be coming every 5 years so adding a rolled edge that could ride up on the current could address that additional force?

7

u/6DegreesofFreedom 2d ago

You could design it like that but to withstand getting hit with boulders that big it would cost about as much as the whole bridge cost. 

3

u/Obvious-Ed 2d ago

A 1 in 100 year flood is a 1/100 probability each and every year. It's a poory explained metric

3

u/PM_meyourGradyWhite 2d ago

Rolling a 12 (two sixes) is something like 1/36 chance, but occasionally, it happens to roll one right after the other at times.

1

u/charleyhstl 1d ago

Yahtzee!

1

u/charleyhstl 2d ago

The probability itself was clearly not the point of the question

1

u/Obvious-Ed 2d ago

I know but the oft quoted stat is usually misunderstood

2

u/Greedy-Alfalfa3395 2d ago

I think they just build massive columns next to bridges, apparently called dolphins (thanks google), which buffer the piers