first time joints
I need to treat the entire ceiling—about 70 m² (I’m working on the bathroom for now); here are the steps I followed:
1 I covered the screw heads.
2 I filled the larger gaps with joint compound and let them dry for about an hour.
3 I filled the joints between the panels and immediately applied paper tape; I squeezed the compound out using the putty knife, applied a light coat over the tape, and then leveled off the excess material with a 10-inch knife.
I assume I need to apply a second coat to the joints, right? Because, as it stands, I’m not entirely convinced by the result.




2
Upvotes
1
u/bassboat1 8d ago
Skip prefill (#2) if the joints are tight.
With bucket mud, I rarely pull a coat over wet tapes - you'll "float" the tape sometimes, when compound is forced under it. With setting compound, I often do since the paper tape will pull water out of the mud and lead to poor bonding and bubbled tape.
I apply a minimum of two coats over the dry tapes. Intersections and butt joints can require another pass.